OK, this was discussed at the Committee meeting the day before the last race and I took responsibility for sorting it out.

So as we have the regulars who have their fair share in building and trail maintenance we feel it is time to make this an official branch of the club so this will be called â??The Trail Maintenance Team"

So the plan is for each person to have their own ''patch'' if you like of a trail on the hill and each month this area should be looked after e.g. raked. There will be small area assigned to each person and to start with it will be one each for the younger members only, then we will find out what is left and people can put their names in for which they would like.

This does not entitle you to be able to build whatever you like in your area, just look after it, this is a fixed rule which has been in the club since the beginning, however if you do have realistic ideas then there is nothing stopping you going to the committee with a request.

So the areas up for grabs are;

Old School

Entrance to all tracks â?? first berm after chutes = James Baker
First berm â?? end of second, long berm
End of second long berm - roots after double
Roots after double â?? final double


The 48

Entrance to track (where it branches from the old school) - start of mini bringewood section (start of woops/small jumps)
Start of mini bringewood - double after off camber
Double after off camber â?? end of trail (transition of second table)


TTT

Start of trail â?? first rock section = Rob cook
First rock section â?? small 2 log drop = Harry Gillman
Small 2 log drop â?? right hand corner after patio
Right hand corner â?? hip jump after loco
Hip jump â?? end of track


So take your pick and lets see who goes where :D

Cookie
06-01-08, 21:21
Hmmmm choices, choices :P I'll have the very first one on TTT please Mr. Baker, I'm also happy to do more than one because i'm not always at build days because of other comitments so more maintainence could compensate. cheers

carrerabiker
06-01-08, 21:39
i want to get involved more but i can never get to the hill but now ive got a bike that works i can probs bike to rasen every week so can i have a "patch" prefrebly the 2nd one on ttt please

Tom
07-01-08, 12:21
looks like ive got Flow Show and Walls

Xpink
07-01-08, 21:38
Can I have roots after double to final double on the old school track please :)

Where does is say wall/flow show??

Tom should do at least two because he loves racking them leaves dont you ;)

carrerabiker
08-01-08, 10:01
its not got any of the north shore , so are we gonna let that get all crapped up?

Baker
08-01-08, 14:37
will put all of places people want in edit soon but currently laying in bed on iPod so it will take some time on here! As for the shore that will be sorted soon but I have only put up the trails that get worst chewing up and leaves and stuff in the winter for now to get them covered! Dont worry I will sort it but when I can get downstairs to the computer!

Rick Brown
08-01-08, 23:30
It would be nice to have half a dozen leaf rakes to do the job and make the individuals responcable for hiding them so they dont get knicked

Baker
08-01-08, 23:42
yeah great idea rick! That'd only be like 6 or if we have 2 per track it'd be 12, six would probably be more logical as it'd be cheaper!